|
|
|
| Function |
The quickest way to construct large-bore sewers is by the use of concrete pipes. The drains that lead underground are constructed from concrete rings. |
|
The machine shown produces large-bore concrete pipes. After concrete has been poured into the mould, an arm with a vibration unit is lowered onto the mould. |
|
The vibration, which is set at a precisely determined level, compacts the concrete. This results in stable pipes and rings. |
| Requirements |
The vibrations are generated by two or more flyweights in the vibration unit.The demands on the bearings are very high: |
|


